KOEBCKE
AktuellesJobsSupportKontaktDeutsch
January 2002 - December 2003
 
The old ice-sports stadium in north Nuremberg was torn down, to be replaced by a modern shopping centre, built by Züblin from Leipzig.

Koebcke was already involved in the preliminary planning stage with the use of EDMS®. Züblin also used the services of EDMS® in the subsequent construction project, to ensure the constant high quality of on-site information. The information handled by the system included e.g. notices of receipt, reports and inspections of incoming components.

Koebcke was a permanent component of the project throughout its on-site duration. A digital printing station networked directly with the construction site was installed in two portakabins provided by Züblin and was used to deliver fast and simple transfer of all information that arose on the site. The complete documentation was handed over in February 2004.

 

To top of page To top of page
Print version Print version
Back Back